๐น Revenue: $15.24M (Est. $24.12M) ๐ด
๐น Adj. EPS: $(0.37) (Est. $(0.14)) ๐ด; DOWN -23% YoY
2025 Guidance (Reaffirmed):
๐น Revenue: $150Mโ$190M (Est. $165M) ๐ก
(H1 Revenue: $25M โ Must deliver $125M+ in H2 to meet low end)
Backlog & Pipeline:
๐น Commercial Pipeline: $18.8B; UP +21% QoQ
๐น Orders Backlog: $672.5M
๐น 8-hour+ storage projects grew 15% QoQ
๐น Frontier Power MOU: 5 GWh (now 10+ GWh submitted to UK Cap & Floor)
๐น 3 active MOUs totaling 6.2 GWh
Manufacturing & Operations:
๐น Record factory shipments: +122% QoQ
๐น Z3 system round-trip efficiency: avg. ~88%, peak 89.5%
๐น Second automated line ordered; subassembly automation ramping
๐น 2025 exit rate target: 2 GWh/year production
Liquidity & Capital Actions:
๐น Raised $336M via stock + convertible notes (oversubscribed)
๐น Total DoE Loan Funding: $91M to date
๐น Convertible Notes (26.5%) restructured:
๐น New maturity: Sep 30, 2034
๐น Lower interest: 7% starting June 30, 2026
๐น Cerberus granted extension to Oct 31, 2025, for loan milestone
๐น OpEx: $32.9M (excl. $5.4M in one-time items)
๐น Total Cash: $183.2M (incl. restricted)
CEO Commentary:
๐ธ โOur strongest operational quarter to date โ production scaled rapidly, revenue nearly matched full-year 2024.โ
๐ธ โZ3 system outperformed design specs; pipeline and operations accelerating.โ
๐ธ โWeโre positioned as a key contributor to U.S. energy independence and grid resilience.โ