1Wkยท

๐€๐’๐“๐€ ๐„๐ง๐ž๐ซ๐ ๐ฒ: ๐’๐ญ๐š๐ซ๐ค๐ž๐ฌ ๐๐Ÿ ๐ฆ๐ข๐ญ ๐Œ๐š๐ซ๐ ๐ž๐ง๐ฌ๐ฉ๐ซ๐ฎ๐ง๐  ๐ฎ๐ง๐ ๐’๐ญ๐š๐ซ๐ค๐ž๐ซ ๐‚๐š๐ฌ๐ก-๐†๐ž๐ง๐ž๐ซ๐ข๐ž๐ซ๐ฎ๐ง๐ 

$ASTA (+0%)


๐Ÿ“Š ๐„๐ซ๐ ๐ž๐›๐ง๐ข๐ฌ๐ฌ๐ž

- Net sales: โ‚ฌ196.4M (+15.3%)

- Net value sales: โ‚ฌ46.4M (+35.7%)

- Adjusted EBITDA: โ‚ฌ17.2M (+68.6%)

- EBITDA margin: 8.8% (vs. 6.0%)

- Result: โ‚ฌ6.3M (vs. โ‚ฌ0.9M)

- EPS: โ‚ฌ0.49 (vs. โ‚ฌ0.09)

- Free cash flow: โ‚ฌ12.1M (+365%)

โ €

๐ŸŽฏ ๐€๐ฎ๐ฌ๐›๐ฅ๐ข๐œ๐ค๐œ๐œ๐ค

- Turnover of over โ‚ฌ790M confirmed for 2026

- Net value sales of over โ‚ฌ170M expected

- Adjusted EBITDA of โ‚ฌ55M-โ‚ฌ59M forecast

โ €

๐Ÿ“Œ ๐–๐ข๐œ๐ก๐ญ๐ข๐ ๐ฌ๐ญ๐ž ๐๐ฎ๐ง๐ค๐ญ๐ž๐ญ๐ž

- Strong demand from the transformer, generator and data center market

- Production ramp-up in Bosnia and China drives growth

- Net cash position of โ‚ฌ38.6M after IPO

- Long-term contracts with Siemens Energy, Prolec GE Vernova and Ganz Electric extended or concluded

- Capacity expansion underway in India, China and Bosnia

โ €

๐Ÿ’ฌ ๐Œ๐š๐ง๐š๐ ๐ž๐ฆ๐ž๐ง๐ญ-๐€๐ฎ๐ฌ๐ฌ๐œ๐š๐ ๐ž

"We have started 2026 with strong momentum. The combination of solid sales growth, significant margin expansion and strong commercial momentum underlines the strength of our business model."

7
1 Comment

profile image
Incorrect linking๐Ÿ˜…. Here is the correct one $AT100ASTA001
โ€ข
4
โ€ข
Join the conversation