5Mon·

Strabag and Porr win contract on the Brenner highway

$STR (+0.84%)
$POS (-1.59%)

were awarded the contract to build the Liegbrücke bridge near Tyrol on the Brenner highway.

After demolition and construction, the contract is worth over 217 million euros.


Unfortunately, Strabag lost against Rasperia in a Russian court. The conglomerate is expected to receive 2.1 billion euros.

The disputes are taking longer than expected.


Despite the death of company boss Klemens Haselsteiner at the age of 44 (17.1), the remaining board members are sticking to the Strategy 2030.

attachment
5
25 Comments

profile image
I'm already looking forward to being able to buy a fresh coffee from Starbucks on my trip to Austria in future 👍
1
View all 22 further answers
profile image
With today's increase, STRABAG has once again reached the exit level for me - my 150 shares just went over the table at € 44.20 🙂
Re-entry is already planned again...
1
profile image
@TomTurboInvest very good. My stop loss is also at +10%
1
Join the conversation