$WULF (+57.82%)
$IREN (+7.42%)
$GOOGL (+1.28%)
$GOOG (+1.14%)


What happens if $Iren reports an HPC/co-location deal with 1.4 GW Sweetwater 1 🤔🚀
TeraWulf $WULF (+57.82%) just signed two 10-year, 200+ MW AI hosting contracts with Fluidstack at its Lake Mariner campus, worth approximately $3.7 billion in contracted revenue and up to $8.7 billion with extensions.
$GOOGL (+1.28%) covers Fluidstack's lease obligations of USD 1.8 billion, thereby eliminating a major financing risk and acquiring approximately 8% of the equity via warrants (approximately 41 million shares).
Phase 1 (40 MW) will go into operation in the first half of 2026, with full commissioning by the end of 2026.
The plant is specially designed for liquid-cooled AI workloads.